From: route@monster.com
Sent: Friday, April 08, 2016 12:12 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 PMP
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Nick Zandi, PMP Mukilteo, WA 98275 Telephone (949) 315-5331 nickzandi@yahoo.com QUALIFICATIONS: 12 years experience in the field of Project
Management, Project Planning, Scheduling, and Cost Control using Primavera
family of products and MS Project. Achieved PMP certification in 2007 EXPERIENCE: Senior Project Scheduler Colorado State Utilities Colorado Springs, CO 06/2014 to
Present Integrating multiple Contractor’s Schedules to develop Integrated
Master Schedule using Primavera (P6) V8.3 to support the construction and
installation of FGD (Flue Gas Desulfurization) for two coal power plants. Project Scheduler Iowa Falls Ethanol Plant Iowa Falls, IA 03/2014 to
05/2014 Developed resource-loaded, logic-driven master Schedule using
Primavera (P6) V8.3 to support the turnaround and provided direct support to
Project Managers with information obtained from schedule updates. Senior Project Scheduler Sooner Power Plant, Oklahoma
Gas and Electric Red Hill, OK 12/2013 to 02/2014
Created Integrated Master Schedule to support the outage activities
and installation of Low Nox system using Primavera 6 R8.3; led the scheduling
group in conducting daily meetings to collect information related to the
progress of the project and to update the schedule. Project Scheduler Mojave Solar Project Helendale, CA 08/2013 to
11/2013 Developed and maintained detailed, accurate schedules and reports
with a focus on activity, logic, Resource, and constraint input into the
scheduling tool for the construction of two new Parabolic Trough Solar Power
Plants using Primavera program. Senior Project Scheduler Palo Verde Nuclear Generating
Station Tonopah, Arizona, 02/2012 to
03/2013 Created and maintained outage schedule to support the engineering and
minor modification projects using Primavera V 6.7 and MS Project 2007;
established strong working relationship with project stakeholders in
scheduling process, especially related to collecting data & communicating
project/program status. Project Scheduler Worsley MultiFuel Cogeneration Project Collie, Western Australia, 10/ 2011 to 02/2012 Supported the scheduling activities for construction and
commissioning of two new power plants using Primavera V 6.7; met with
stakeholders on a daily basis to gather information related to the project;
updated the schedule and created various reports for the client. Outage Project Scheduler Monticello Nuclear Generating Plant Monticello, Minnesota, 10/ 2010 to 10/2011 Created and maintained Primavera (P6) master schedule for the
Extended Power Uprate (EPU), on-line, and outage activities; participated in
development, implementation, and maintenance of scheduling processes and
tools. Project Scheduler Dayton Power and Light Aberdeen, Ohio, 09/ 2010 to 10/
2010 Created and updated Primavera (P6) project schedule for re-heater
head replacement project and outage activities; attended daily meetings to
gather information to update the schedule; provided various EVM cost and
schedule reports to management. Senior Project Scheduler Palo Verde Nuclear Generating
Station Tonopah, Arizona, 09/ 2009 to
04/ 2010 Created Integrated Master Schedule for Nuclear and Strategic
projects; supported the online and outage activities using Primavera P6 and
Project view; conducted Primavera training sessions for in-house schedulers. Project Manager/Scheduler US Department of Energy,
Richland Operations Office
Richland, Washington, 06/ 2009
to 09/ 2009 Supported the Mission Support Alliance (Lockheed Martin) by reviewing
the Department Of Energy SOW (Statement of Work) to create Primavera (P6)
project code structure and WBS (Work Breakdown Structure) to interface with
COBRA; met with Project Managers from various departments to build
Primavera (p6) schedule activities to support the Hanford Nuclear Site
cleanup operations. Project Scheduler Xcel Energy Monticello, Minnesota, 02/ 2009
to 04/ 2009 Supported the Refueling Outage and Extended Power Upgrade schedules;
updated the outage-related activities on an hourly basis and prepared various
reports for management and stakeholders using Primavera (P6). Project Controller/Scheduler ITER (International
Thermonuclear Experimental Reactor) St. Paul-Lez-Durance, France,
09/ 2008 to 01/ 2009 Analyzed Domestic Agencies Diagnostics schedules to ensure their
conformity with ITER Project Manuel standards; created Procurement
Arrangement schedules for Diagnostics Systems using Primavera P6;
participated in weekly schedule meetings and communicated project status to
team members. Project Planner/Scheduler Boeing (787 Airplane
Program)
Everett, Washington, 08/ 2005
to 09/ 2008 Developed and maintained project plans and resource-loaded integrated
schedules in Primavera P6 / MS Project for multiple projects; performed
various analyses such as Critical Path & Float, Performance and Recovery,
and recommended corrective action/mitigation to ensure cost & schedule
targets were achieved Primavera Scheduler Analytical Planning Services,
Inc. (APSI) Irvine, CA, 01/ 2005 to 08/
2005 Developed and cost loaded construction schedules; performed monthly
schedule updates and prepared payments applications; analyzed Time Impact and
schedule delays; created and maintained the Los Angeles World Airports (LAWA)
master schedule using p3e/c. Primavera/MS Project Scheduler Metropolitan Water District
(MWD)
Los Angeles, CA, 03/ 2004 to
10/ 2004 Developed and maintained various Project Schedules using Primavera P5
and Microsoft Project; updated schedules on a monthly basis and prepared cost
and resource reports; ensured completion of project objectives; assembled
recommendations from project team and provided status updates to leadership
and stakeholders. Primavera Project Scheduler Compliance Resource, Inc. (CRI
Services) Newport Beach CA, 06/ 2003 to
01/ 2004 Developed and managed project schedules for a large Engineering
Construction Company using Primavera Project Planner (p3) and Primavera
Enterprise (p3e); analyzed critical path, cost and resource loading, schedule
content, use of relationships and lag, constraints and milestones. Primavera Project
Scheduler
San Onofre Nuclear Generating
Station
(SONGS)
San Onofre, CA, 03/ 2002 to 06/
2003 Developed detailed resource-loaded schedules and updated progress on
a regular basis; identified activities involved in design and electrical
engineering projects and calculated time duration for activities; established
detailed activity code, calendar, and WBS structure. Page 1 of 2 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|